Skip to content
New upper storey above an existing brick bungalow in Toronto.
Toronto & the GTA

Second-Storey Additions

More room upstairs. The neighbourhood you know. Olkron coordinates drawings, structural engineering and permit applications, then builds and finishes your new level.

Discuss your addition
5.0Google Reviews6 featured reviews
01 / The possibilities

Second-storey addition options

Planning a second-storey addition in Toronto or the GTA? Start with the rooms you need, or bring the plans you already have. Olkron can help define the scope around your existing home.

A second-storey addition creates bedrooms, bathrooms or a home office above all or part of an existing home. Building upward can retain yard space. Choose between a full new level and a partial addition; a bungalow top-up can take either form.

  • Full new level
  • Partial addition
  • Bungalow top-up

Full new level

Plan several rooms across a new upper floor. The layout, roof and structural support need to work together with the existing home.

Concept illustration · subject to property assessment

Partial addition

Add upper-level space over part of the house. A smaller footprint still needs careful planning for stairs, roof connections and the rooms beneath.

Concept illustration · subject to property assessment

Bungalow top-up

Add a full or partial upper floor above your bungalow. The right approach depends on the existing structure and the rooms you need.

Explore bungalow top-ups
Concept illustration · subject to property assessment

Need more space on the ground floor? A rear or side addition may better suit your plans.

Compare addition options
Timber framing inside Olkron’s Richmond Hill second-storey extension
02 / Your property

Can your home support another storey?

Olkron assesses the existing home before defining the new level. These four areas shape the design and construction scope.

Olkron arranges a structural review of the foundation, footings and load-bearing walls. This establishes how the new floor’s loads reach the ground and whether reinforcement is needed.

We plan the stair location alongside the upstairs rooms. The assessment considers the space taken from the floor below and how people will move between both levels.

We review the roofline, windows and exterior junctions with the design team. The scope must account for roof removal or alteration, weather protection and the connection between old and new construction.

Olkron arranges architectural drawings and coordinates engineering and permit applications. We review the requirements for your property and proposed scope; the municipality determines approval.

03 / The build

From drawings and permits to construction

Olkron takes your addition from the initial brief through design, permit applications and construction, working with the relevant architectural and engineering professionals.

  1. Set the brief

    Tell us which rooms you need, your property location, budget expectations and preferred timing. An initial idea is enough to start; existing drawings are welcome.

  2. Assess and coordinate

    Olkron arranges the architectural drawings, coordinates structural engineering and manages the permit application process. The design develops around your existing home and the requirements for the property.

  3. Define the build

    Agree the written scope, estimate and construction sequence. Identify work upstairs and below, finish selections, allowances and exclusions, including any temporary accommodation you may need.

  4. Build and connect

    Olkron builds the addition and coordinates inspections through structural work, framing, the exterior enclosure and interior finishes. Stairs and building services connect the new level to the existing home.

Budget and timeline

What shapes the cost and timeline?

The estimate should define the work upstairs and below, including structural changes, services and finishes. Confirm allowances and exclusions before agreeing the build.

Talk through your plans
  • Size and layout

    The floor area, number of rooms and stair arrangement shape the amount of work.

  • Existing structure

    Reinforcement, access and the condition of the existing building affect the construction scope.

  • Connections and finishes

    Bathrooms, building services, roof junctions and finish selections influence the budget.

  • Readiness and sequencing

    Planning includes design, engineering and permit review. Construction follows the agreed scope and approvals; material lead times, weather and site conditions affect sequencing.

05 / Real work

Second-storey addition projects

See Olkron’s work above a Toronto bungalow, over an existing garage in Mississauga and inside a new upper level in Richmond Hill.

More project work
Brick bungalow with a new dark-clad upper storey in Toronto.Toronto

A bungalow, built upward

A Toronto bungalow with a new dark-clad upper floor above the original brick storey, shown in Olkron’s project gallery.

New upper level under construction above the original Plainfield bungalow in TorontoToronto

Plainfield bungalow top-up

See how a Toronto bungalow top-up was planned and permitted, from a proposed three-bedroom upper floor to a revised gabled roof and on-site framing.

Roof framing above the existing double garage at the Rimon project in MississaugaMississauga

Rimon Over-Garage Addition

An upper-storey addition above an existing double garage in Mississauga, shown through roof framing and exterior construction.

Exposed timber framing and window openings at Olkron’s Richmond Hill second-storey extension.Richmond Hill

Inside the new level

Olkron’s Richmond Hill extension during construction: timber framing defines the new rooms and window openings before interior finishes.

What homeowners say about working with Olkron

ExcellentGoogle
Read our Google reviews
06 / Before You Build

Second-storey addition FAQs

Yes. A bungalow top-up adds upper-level space to a single-storey bungalow. It can cover all or part of the home. Full and partial describe the addition’s scope; bungalow describes the home you are starting with.

A partial addition may suit a smaller room requirement, but it still needs stairs, structural support and roof connections. Olkron can compare full and partial layouts after reviewing your home. A smaller footprint does not reduce every cost proportionally.

A vertical addition places new rooms above the existing home rather than extending them into the yard. The final design may also include changes at ground level. Construction access and temporary use of outdoor areas should be discussed during planning.

No. You can start with an idea. Olkron can arrange the architectural drawings and manage the permit application process as part of planning your addition. If you already have drawings or approvals, we can work from that starting point.

A useful estimate needs a property review and a defined scope. It should identify structural work, stairs, roof and exterior work, building services and finishes, with allowances and exclusions made clear. Planning covers drawings, engineering and permit review; construction has its own sequence. Olkron can discuss both once the proposed work is understood.

Discuss occupancy before the construction plan is agreed. Roof work, structural changes, access and service interruptions affect how the existing home can be used. The answer needs to be established for your scope and sequence.

07 / Your addition

Tell us what you’d like upstairs.

Start with the rooms you need and the home you have. Olkron can arrange drawings and manage permit applications, or work from the plans you already have.

Call (905) 236-81115.0Google Reviews6 featured reviews
01 / Your addition
What would you like to add?
Existing home

Help me decide

Start with the rooms you need. Olkron can discuss the options after reviewing your existing home and goals.

Concept only. Feasibility depends on your property assessment.