Skip to content

Bathroom Renovations

A better shower. Storage where you need it. Olkron coordinates your bathroom renovation, from layout planning through construction and finishing.

Plan your bathroom renovation

A bathroom that works for your everyday.

5.0Google Reviews6 featured reviews
Bathroom with a freestanding bath, tiled walls and a timber double vanity, from Olkron’s project gallery

The room, before the finishes

What needs to change?

You do not need every tile selected to begin. Start with how the bathroom feels to use now.

Keep the layout. Renew the room.

When the arrangement works, focus on the shower or bath, vanity, tile and fixtures. Retaining their positions still means checking the services and surfaces beneath them.

Make room for the way you use it.

A walk-in shower, a different bath or a new layout starts with the space available. Resolve drainage, ventilation and movement around the fixtures before choosing the finishes.

Give everyday things a place.

Plan vanity storage, lighting and mirror space around the people sharing the bathroom. A double vanity is one option; a better single vanity may fit the room more comfortably.

Built from the inside out

The tile is only
the surface.

A bathroom renovation joins several kinds of work in a small space. What sits behind the walls and beneath the floor matters as much as the finish you see.

Talk through your bathroom
Shower walls and plumbing during a bathroom renovation, before tiling
The layout
Check fixture positions, door swings, storage and the space to move. Changing the arrangement can extend the work into adjoining walls, floors or ceilings.
The concealed work
Coordinate plumbing, ventilation, wet-area preparation and waterproofing as part of the scope. Review the existing conditions before covering them with new finishes.
The finish
Bring tile, fixtures, vanity and lighting decisions into the plan early enough for dimensions, supply and installation to work together.

Made for the morning rush.Built for the years after.

Architectural concept artwork blending a bathroom photograph with pencil drawings

Planning through construction

One room.
Several trades.
A joined-up plan.

Olkron coordinates the work from the first conversation through construction and finishing, with the relevant professionals and inspections along the way.

Changing walls as well?
  1. Start with the room you have.

    Bring photos, ideas or existing drawings. Tell us what is not working, what you want to retain and whether another bathroom will be available during construction.

  2. Resolve the work behind the finishes.

    Review the layout, plumbing, ventilation and wet areas. Olkron coordinates the relevant professionals, drawings and permit applications required for the proposed scope.

  3. Agree what goes in—and when.

    Confirm fixtures, vanity, tile, allowances and exclusions before demolition. Product availability, access and inspections all belong in the construction sequence.

  4. Build through to the finished room.

    Olkron manages the agreed demolition, service coordination, wet-area work and finishing. Any discovered conditions are reviewed before the scope changes.

Before the bathroom
comes out of use.

A clear scope makes it easier to plan around the work. Discuss these together before demolition.

Budget
Agree what the estimate includes: fixtures and finishes, changes to plumbing and ventilation, and amounts set aside for products you have not chosen yet. Confirm any excluded work. Moving fixtures or finding hidden problems can affect the cost.
Timing
Include approvals and product lead times, as well as the construction itself. Confirm the sequence once the scope is understood.
Your household
Agree how the rest of the home will be protected, when services may be interrupted and which bathroom you will use during the rebuild.

What homeowners say about working with Olkron

ExcellentGoogle
Read our Google reviews

A few practical questions

Before you begin.

No. Start with the room you have and the changes you want. Olkron can arrange the required planning and drawings, or work from existing plans.

Yes, retaining the arrangement is an option. The condition of the room, existing services and proposed fixtures still needs to be reviewed before the scope is set.

It is an option to discuss. The available room, drainage and wet-area construction need to be reviewed before confirming the arrangement and scope.

Requirements depend on the proposed work and municipality. Olkron reviews the scope and coordinates required applications with the relevant professionals. Confirm the requirements for your project before construction begins.

Olkron reviews any discovered conditions before the scope changes. Before demolition, agree which work is included, what is excluded and how additional work will be reviewed.

A full rebuild puts the room out of use for part of the work. Discuss access, service interruptions and alternative arrangements when the sequence is planned, especially if it is your only bathroom.

Start with what you know

What would make your
bathroom work better?

Bring photos, a few ideas or the plans you already have. Tell us what is staying, what is changing and where your home is.